KCA Deutag awarded Oman drilling contracts
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The first award covers the provision of expert manpower for customer-owned rigs, hoists and workshops. In total, KCAD will provide approximately 420 people in delivering this contract. This is a 5-year extension to a contract originally awarded in 2015.
One-year contract extensions have also been awarded for 8 KCAD rigs working in Oman.
Alongside these contract awards, KCAD's T-82 rig has spudded the Group's first well in Kuwait, representing a successful entry for the company into this attractive market. The rig is equipped with key components from Bentec, KCA Deutag's manufacturer of drilling rigs, oilfield and energy equipment.
Commenting on the awards, Simon Drew, President of Land said: "These awards demonstrate that despite challenging markets, KCA Deutag's operational strengths and capability at - and beyond - the rig site, continue to be recognised by our customers.
We are also pleased to extend the geographic footprint of KCA Deutag, Bentec and our Well of Innovation Technologies into Kuwait and to take our industry-leading capabilities into a strong new market for the business, as we build out our presence in the Middle East, a core market for the Group."
For more news and technical articles from the upstream industry read the latest issue of Oilfield Technology magazine.
Oilfield Technology's September/October 2020 issue
The September/October issue begins by looking at the recovery of the North American upstream industry before going on to cover a range of technical features. These include Completions, Software and Automation, MWD/LWD among others, as well as our Downhole Tools Review.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/13102020/kca-deutag-awarded-oman-drilling-contracts/
You might also like
Trendsetter Engineering, Inc. announces two-year contract extension with operator in Brazil
The company has announced a two-year contract extension with a major Operator in Brazil for the use of the 6 in., 15K Trident Intervention System to facilitate well interventions as well as plug and abandonment operations.