Sole gas field begins producing to processing plant
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Gas produced by the field is being used to commission the plant’s raw gas processing facilities. Initial gas production and processing levels will be at small volumes. Gas production is expected to increase gradually as the second phase commissioning progresses towards completion and the performance of a full-rate production test.
Satisfaction of the commissioning activities will enable commencement of gas supply from Sole to the customers under long-term contracts.
APA Group have advised that full rate production and commercial operation for firm gas supply are anticipated in March 2020.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/11032020/sole-gas-field-begins-producing-to-processing-plant/
You might also like
FutureOn launches FieldTwin Operate to streamline subsea operations
FutureOn, a global offshore energy software company, today announced the launch of FieldTwin Operate, a digital twin for subsea operations that brings together project design, engineering and inspection data in a single geospatial operational environment.