First oil expected at Evelyn field by 2022
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Ensuring that environmental matters have been fully considered for the Evelyn development, before the full field development decision is taken, Tailwind has prepared an Environmental Statement presenting the findings of the Environmental Impact Assessment and has been submitted to the Secretary of State for Business, Energy and Industrial Strategy (BEIS). A public consultation on the plans is underway.
Tailwind will make a final investment decision on the Evelyn field in 2020, conditional upon the approval of the Environmental Statement.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/11032020/first-oil-expected-at-evelyn-field-by-2022/
You might also like
Chevron achieves first oil at Future Growth Project in Kazakhstan
Chevron Corporation has announced that its 50% owned affiliate Tengizchevroil LLP (TCO) has started oil production at its Future Growth Project (FGP) located at the Tengiz oil field in Kazakhstan.