First oil expected at Evelyn field by 2022
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Ensuring that environmental matters have been fully considered for the Evelyn development, before the full field development decision is taken, Tailwind has prepared an Environmental Statement presenting the findings of the Environmental Impact Assessment and has been submitted to the Secretary of State for Business, Energy and Industrial Strategy (BEIS). A public consultation on the plans is underway.
Tailwind will make a final investment decision on the Evelyn field in 2020, conditional upon the approval of the Environmental Statement.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/11032020/first-oil-expected-at-evelyn-field-by-2022/
You might also like
BOEM analyses proposed offshore well stimulation work at platform Gilda offshore California
The Bureau of Ocean Energy Management has issued a Notice of Intent to prepare an Environmental Impact Statement for a proposed update to the Santa Clara Unit Development and Production Plan, which includes the use of hydraulic fracturing on 16 existing wells at Platform Gilda, located 8.8 miles offshore Ventura County, California.