LUKOIL begins drilling new production wells at West Qurna-2
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The drilling campaign will ramp up production at West Qurna-2 from the current level of 400 thousand bpd to 480 thousand bpd in 2020.
To deliver the project LUKOIL uses an approach to cluster drilling which envisages erection of two drilling rigs at one well pad. This approach is new for Iraq and will provide for significant field development speed up and production growth within the shortest time.
Over five hundred Iraqis, residing in proximity to West Qurna-2 field, will be employed for the drilling campaign.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/08022019/lukoil-begins-drilling-new-production-wells-at-west-qurna-2/
You might also like
Equinor Energy concludes the drilling of exploration well 30/11-15 in the North Sea
The well was drilled by the ‘Deepsea Stavanger’ drilling rig, about 25 km southwest of the Oseberg field in the North Sea and 150 km west of Bergen.