Skip to main content

LUKOIL begins drilling new production wells at West Qurna-2

Published by , Editorial Assistant
Oilfield Technology,


LUKOIL commenced drilling of new production wells at West Qurna-2 field as part of the second development phase. The company has so far concluded contracts to drill 57 production wells, including 54 wells at Mishrif formation and 3 wells at Yamama formation.

The drilling campaign will ramp up production at West Qurna-2 from the current level of 400 thousand bpd to 480 thousand bpd in 2020.

To deliver the project LUKOIL uses an approach to cluster drilling which envisages erection of two drilling rigs at one well pad. This approach is new for Iraq and will provide for significant field development speed up and production growth within the shortest time.

Over five hundred Iraqis, residing in proximity to West Qurna-2 field, will be employed for the drilling campaign.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/08022019/lukoil-begins-drilling-new-production-wells-at-west-qurna-2/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Oil & gas news