Cuadrilla welcomes Angus Energy’s completion of flow test of oil at Balcombe
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The well, Balcombe-2z, flowed at 853 boe/d and 1587 boe/d during two separate test runs.
Francis Egan, CEO of Cuadrilla, said: “We are encouraged by the results from two initial flow tests of the Balcombe horizontal exploration well. Further analysis of the data collected will be carried out, and potentially further testing may be required, to finally determine the commercial potential for the site.”
Angus Energy joined the existing Cuadrilla/Lucas partnership through the acquisition of a 25% interest in UK onshore licence PEDL244, which includes the entire Balcombe Field discovery in West Sussex, earlier in 2018.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/03102018/cuadrilla-welcomes-angus-energys-completion-of-flow-test-of-oil-at-balcombe/
You might also like
Wood boosts North Sea operations with triple extension awards
Wood has announced a trio of reimbursable contract extensions worth US$118 million to continue to deliver operations and maintenance solutions for Shell UK, Dana Petroleum and CNOOC International’s UK business.