Norwegian Petroleum Directorate grants ConocoPhillips drilling permit
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Well 25/7-7 will be drilled from the Leiv Eiriksson drilling facility in position 59 18`59.95 N and 02 12`42.66 E.
The drilling programme for well 25/7-7 relates to the drilling of a wildcat well in production licence 782 S. ConocoPhillips Skandinavia AS is the operator with an ownership interest of 40%. The other licensees are Equinor Energy AS (20%), Aker BP ASA (20%) and DEA Norge AS (20%).
The area in this licence consists of parts of blocks 25/7 and 25/10. The well will be drilled about 17 km northwest of the Balder field.
Production licence 782 S was awarded on 6 February 2015 in APA 2014. This is the first well to be drilled in the licence.
The permit is contingent on the operator securing all other permits and consents required by other authorities prior to commencing the drilling activity.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/01082019/norwegian-petroleum-directorate-grants-conocophillips-drilling-permit/
You might also like
Pitting Corrosion vs. Crevice Corrosion in Stainless Steel: Key Distinctions and Prevention
Corrosion in oil and gas tubing systems costs over $1 billion annually (source: NACE). Common types like pitting and crevice corrosion can be mitigated with proactive identification and appropriate solutions, preventing costly damage to fluid systems.