Skip to main content

Aker Solutions to develop digital twin for Wintershall’s Nova field

Published by
Oilfield Technology,


Through two separate agreements, Aker Solutions will provide both a fully interactive digital replica of the integrated production system as well as undertake a study to enable live data streaming and condition monitoring of the subsea equipment.

The digital twin will become an advanced replacement to traditional paper-based handbooks and equipment documentation, ensuring that all relevant engineering data is held centrally in a single, interactive and searchable solution. It will be built on a cloud-based architecture capable of processing live data and ensuring that vital engineering information is kept up to date at all times.

The connected study to enable live data streaming from the subsea production equipment will be instrumental in driving forward real time subsea condition monitoring, production optimisation and predictive maintenance for the field.

“These ground-breaking pieces of work will ensure that the Nova field operates as a truly digital asset,” said Are Føllesdal Tjønn, Head of Software Development for Aker Solutions. “We are delighted to work with our customer to support the realisation of their ambitious digital plans and to help set new standards for the energy industry.”

Nova was discovered in 2012 and is situated in the Quadrant 35 area in the Norwegian North Sea. Aker Solutions was awarded the contract to deliver the subsea production system for the field in early 2018.

Read the article online at: https://www.oilfieldtechnology.com/digital-oilfield/22022019/aker-solutions-to-develop-digital-twin-for-wintershalls-nova-field/

You might also like

Kabel Schlepp

WEBINAR - Key criteria to ensure proper selection of a cable drag chain

In this webinar KabelSchlepp will review and discuss the items needed to ensure that a cable track is properly selected and sized for the user’s application. How diameters and weights of the fill package effect cable track selection and how the jacket material of the fill package influences the cable track design. Register for free today »

 

ConocoPhillips outlines 2020 – 2029 strategy

Part of the company's 10-year plan includes a free cash flow of approximately US$50 billion based on a real WTI price of US$50/bbl and annual capital expenditures averaging less than US$7 billion over the decade.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Offshore news Digital oilfield news Oil & gas news