Upstream project news
Petrofac agrees service contract with ONEgas
The contract positions Petrofac to support the Clipper South complex, Leman Alpha assets, Bacton Terminal, and ONEgas Barge campaigns in the Southern North Sea.
Neptune Energy’s subsea wells in Norway digitised with gaming tech
The new digital twins of Neptune’s wells were developed using a data visualisation platform based on 3D gaming technology to enhance drilling and production efficiency, and reduce time and costs.
Halliburton and Schlumberger secure drilling contracts with ADNOC
The two companies, along with ADNOC Drilling, will provide rigless services across six of ADNOC's artificial islands in the Upper Zakum and Satah Al Razboot fields.
Express Engineering specified for European offshore carbon capture project
Express Engineering will participate in a long-term environmental project that will allow liquefied CO2 to be transported by undersea pipeline to a subsea storage facility located in the North Sea.
Ardyne and Equinor form well decommissioning JIP
Equinor and Ardyne are jointly funding the £1 million project, which will aim to develop a well decommissioning technology that will reduce the economic and environmental impacts of slot recovery and decommissioning.
FUELSAVE and Seadrill partner on decarbonising offshore drilling
Seadrill’s West Saturn drillship will be fitted with FUELSAVE’s combustion conditioning technology to reduce fuel consumption and harmful emissions while it operates in the Bacalhau field in Brazil.
Valaris awarded 16-well contract offshore Australia
Woodside has contracted the VALARIS DPS-1 semisubmersible for the campaign.
AGR wins well management contract offshore Australia
The contract with Western Gas covers well construction, drilling engineering, procurement, supply chain, regulatory compliance requirements and operational supervision of the well in WA-519-P.
Subsea 7 and Aker Solutions land Kobra East & Gekko contracts
The Kobra East & Gekko field, located in the Alvheim area of the North Sea, is operated by Aker BP.
Equinor extends Maersk Intrepid's work at Martin Linge field
The added well intervention scope has a firm duration of 31 days, which means that the Maersk Intrepid rig is now contracted until February 2022.