Skip to main content

Upstream project news

 

IOG spuds Southwark development well

First gas is expected at Southwark in mid-2022 after the planned installation in 1Q22 of the 6 km Saturn Banks pipeline extension to the Southwark platform.

 
 
 
 
 
 
 

Strohm supports Trident offshore Equatorial Guinea with TCP system

The first fully bonded 2.5 in. ID, 2200 m TCP flowline with the weight coating innovation has been supplied to Trident Equatorial Guinea Inc. to support operations at its Elon-C tie-back, located offshore on the west coast of the Central Africa region.