Skip to main content

Upstream project news

Southwark drilling programme halted

The Noble Hans Deul rig is expected to remain offshore with non-essential crew and equipment demobilised while an issue with rig stability is rectified.

 
 

Oil discovery made near North Sea Fram field

Preliminary calculations of the expected size indicate between 3.3 and 5.2 million standard cubic metres of recoverable oil equivalent, or around 21–33 million barrels of recoverable oil equivalent.

 
 
 
 

IOG spuds Southwark development well

First gas is expected at Southwark in mid-2022 after the planned installation in 1Q22 of the 6 km Saturn Banks pipeline extension to the Southwark platform.