Upstream news
Anglo African Oil & Gas plc: update on TLP 103 well on Tilapia field
Whilst drilling through the shallow section a number of drilling challenges were encountered, caused by localised geological conditions, which resulted in ground movement that impacted the safe operation of the rig.
LAGCOE 2019 Expo expands to New Orleans, Louisiana
LAGCOE, a nonprofit energy industry organisation focused on promoting commerce and connecting people through educational programmes and a technical exposition and conference, announced it will host LAGCOE 2019 in New Orleans, Louisiana at the Ernest N. Morial Convention Center.
Europa Oil & Gas (Holdings) plc: update on Holmwood Prospect
Following the Minister’s decision, the company, on behalf of its partners, will be withdrawing its planning application to drill the Holmwood prospect from the Bury Hill Wood site.
Ashtead appoints new corporate development director
The company has underlined its commitment to continued growth with the appointment of Stephen Steele as corporate development director.
Petrotechnics’ survey reveals low oil price is impacting operational risk and process safety management in hazardous industries
Industry leaders expose the current reality of risk awareness and safety culture.
PG Flow Solutions to deliver pump systems to Johan Sverdrup phase 2
Under the contract, PG Flow Solutions will supply a total of six pump skids, including pump skids for scale inhibitor injection, drag reducer injection, emulsion breaker and MEG injection.
2H Offshore expands STREAM JIP for improved SCR and lazy-wave riser design
In this collaborative effort, field data from four deepwater steel catenary risers (SCR) and one lazy-wave riser were used to provide a measurement-based foundation for riser modelling.
Put a plug in it
Mark Sørheim, HydraWell, Norway, examines plugging offshore wells without the support of a drilling rig as a cost-saving solution.
Halliburton sets record for deepwater liner hanger installations on Hess Stampede project
The XtremeGrip liner hangers have been installed to a depth of 30 924 ft in the Gulf of Mexico Hess-operated Stampede deepwater development, setting a record depth for the XtremeGrip system.
COOEC-Fluor completes module fabrication for Huizhou Oilfield Project
The fabrication yard delivered to the aggressive schedule and fabricated the 4000 t, 4-deck topsides in less than 12 months with no follow-on work.