Skip to main content

Upstream news

Subsea 7 awarded three contracts by Woodside

Each contract is for engineering studies and includes an option for Woodside to proceed to the execute phase with an engineering, procurement, construction and installation (EPCI) contract.

 
 
 
 
 
 
 
 
 

Magma and Shawcor collaborate to offer standardised insulated m-pipe

Magma sought to further improve the thermal insulation properties of m-pipe in order to maintain flow temperature for a number of current projects. Shawcor’s Thermotite® ULTRA™ was identified as having the required thermal insulation to achieve this.