Skip to main content

Offshore news

 

Otto Energy: SM 71 update - drilling ahead

SM 71 F2 drilling ahead at 4895 ft MD after setting 10 3/4 in. surface casing at 3685 ft MD. Drilling is proceeding according to plan and the well will reach TD prior to the end of December.

 
 
 

Kvaerner awarded contract for Valhall Flank West

Aker BP has awarded Kvaerner a contract for delivery of the topside and steel jacket substructure for Valhall Flank West. This is the first project in the Wellhead Platform Alliance, which was established in the spring of 2017 between Aker BP, Kvaerner, ABB and Aker Solutions.

 
 
 
 

Repsol Norge selects Atkins to design Yme structural remediation

Atkins has been awarded a contract with Repsol Norge AS (RNAS) to provide structural front end engineering design (FEED) and detailed design services for the remediation of the Yme asset in the Norwegian Central North Sea following completion of Repsol’s project sanction.