Skip to main content

Offshore news

Byron Energy completes SM58 acquisition

Byron has closed the previously announced acquisition of the South Marsh Island 58 (‘SM58’) lease block including the SM58 #E1 producing wellbore and the SM69 E platform and flowlines.

 

Subsea 7 awarded three contracts by Woodside

Each contract is for engineering studies and includes an option for Woodside to proceed to the execute phase with an engineering, procurement, construction and installation (EPCI) contract.

 
 
 

Magma and Shawcor collaborate to offer standardised insulated m-pipe

Magma sought to further improve the thermal insulation properties of m-pipe in order to maintain flow temperature for a number of current projects. Shawcor’s Thermotite® ULTRA™ was identified as having the required thermal insulation to achieve this.

 
 

Equinor: Gullfaks C can be used until 2036

The Norwegian Petroleum Directorate is giving a green light to using the C platform on the Gullfaks field in the North Sea until 30 June 2036.