Offshore news
Wood Mackenzie comments on ExxonMobil's sale of Gippsland Basin upstream assets
Wood Mackenzie research director, Angus Rodger, said that he expects strong interest in the assets from Australian companies.
MInteg secures North Sea asset inspection contract
The work scope, valued at a seven figure sum, includes the inspection of infrastructure on five manned platforms and multiple unmanned satellite platforms.
Production begins at Utgard field
Recoverable Utgard resources are estimated at around 40 million boe and daily production on plateau will be around 43 000 boe.
Ashtead Technology completes subsea installation monitoring for Ocean Installer
The contract saw Ashtead Technology provide its integrated Deflection Monitoring System (DMS) services and equipment to support the installation of eight Integrated Template Structures (ITS) in Equinor’s Askeladd and Johan Castberg fields.
Schlumberger begins wide-azimuth survey in Gulf of Mexico
The survey is in the the Salina del Istmo Basin in the Bay of Campeche and includes the recent Zama-1 discovery.
Equinor, Aker BP and Wellesley Petroleum make gas discovery in Norwegian Sea
Recoverable resources in the Ørn exploration well are estimated at 8 – 14 million m3 of oil equivalent, corresponding to 50 – 88 million boe.
COSL Drilling Europe achieves OPITO CMS approval
The Norwegian contractor, who demonstrated and implemented a best practice CMS covering operations on one of its North Sea assets, achieved the accreditation in under four months.
Oilex enters exclusivity agreement for Irish Sea licences
The agreement with Koru Energy is for a potential acquisition of up to a 50% relevant interest in the Knox and Lowry, and Whitbeck gas discoveries in the East Irish Sea.
Cooper Energy plugs Annie-1 wellbore
Abandonment of the well has been delayed following failure of 2 of the Diamond Offshore Ocean Monarch drilling rig’s 8 mooring chains.
VAALCO Energy begins Gabon drilling campaign
Drilling of the Etame 9P appraisal wellbore is expected to take approximately four weeks, after which the company will commence drilling the Etame 9H development well targeting the Gamba reservoir.