GEODynamics releases FracIQ Limited Entry Perforating System
The system has been applied in over 1000 frack stages since field testing began in April 2016.
The system has been applied in over 1000 frack stages since field testing began in April 2016.
Hardbanding Solutions have successfully restored an offshore Russian drilling contractor's drill pipe showed signs of wear and traverse cracking.