Skip to main content

New drill string camera to slash rig time

Published by , Editorial Assistant
Oilfield Technology,



ITF project launch

The Industry Technology Facilitator (ITF) has launched the project with Clearview Well Services of Perth, Australia with the support of two global oil and gas operator members.

Clearview Well Services will build a prototype to live test its CDFC, a new multi-function camera that for the first time will carry out jet blasting during visual inspections. The technology requires approximately 50% less rig time than traditional methods.

Dale Parker, inventor and director of Clearview Well Services said:

“Currently during inspections existing drill string mounted cameras flush the area with clean fluid, but carry out a separate time-consuming operation if the area requires cleaning. Our system includes a flushing function and also a high pressure jet cleaning action for the internals of the blow out preventer, wellhead, tree, hydraulic couplings and riser surfaces. It will then repeat the flushing, so that in one operation the area can be viewed, cleaned and checked. It means that operators don’t have to carry out the work ‘blind’ or in two additional trips.”

The CDFC can be rapidly deployed by helicopter to carry out the operations in one trip of the drill string. The camera and functions are operated via fibre optics from the surface. It is estimated it could save around £280 000 (AUD$600 000) per 1000 m in rig time, which would increase the deeper the well.

Dr Patrick O’Brien, CEO of ITF said:

“Two of our global operator members took a great interest in the proposal from Clearview Well Services. It is a costly global challenge which will be of great interest to the wider industry. Despite the current downturn, there is still an appetite to find innovations that can deliver crucial efficiency savings and reduce bed spaces and the CDFC fits that brief perfectly.”

The designs have been reviewed by the operators and the JIP funding will be used to create a prototype for a live test within six months and it is hoped the technology will be qualified and moving to manufacture before summer 2016.

Adapted from a press release by Louise Mulhall

Read the article online at: https://www.oilfieldtechnology.com/product-news/08092015/new-drill-string-camera-could-slash-rig-time-by-50/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news