Hardbanding Solutions release new standard operating programme
Published by Joseph Green,
Editor
Oilfield Technology,
A new standard operating procedure for the application of Duraband® NC hardbanding on completion tubing connections has just been released by Hardbanding Solutions by Postle Industries.
The upset connections of 2-7/8 and 2-3/8 tubing are experiencing excessive wear in many drilling environments, especially horizontal drilling.
This excessive wear is not allowing the normal amount of recuts, effectively causing the tubing to be scrapped before reaching 100% of its useful life.
This procedure, which has been shown to significantly increase service life, calls for the application of Duraband NC hardbanding to both pin and box near the taper, allowing for multiple re-cuts as necessary. This procedure applies for both new and re-applications.
Adapted from a press release by Joe Green
Read the article online at: https://www.oilfieldtechnology.com/product-news/03122014/hardbanding-duraband-postle-industries-tubing-connections-1040/
You might also like
Nigeria’s oil and gas industry expands as crude and condensate production reaches 554.4 million bbls and gas output grows by 7.5 billion ft3/d in 2025
Sarens and its subsidiary in Nigeria, Sarens Buildwell, has positioned itself as the optimal strategic partner for the oil and gas sector due to its strong commitment to the highest international standards of safety and operational excellence.
