Siemens Energy to supply topsides turbomachinery scope for Búzios 6 FPSO project
Siemens Energy will supply both the power generation and compression packages for the Petrobras-operated P-78 FPSO.
Siemens Energy will supply both the power generation and compression packages for the Petrobras-operated P-78 FPSO.
Gas production will be doubled from the Duva field in the North Sea, enabling an increase of 6500 boe/d from the first half of April.
The transaction includes the undeveloped Cambo and Rosebank fields in the UK North Sea.
Equinor and partner Cenovus Energy have not yet made a final investment decision on whether to build the Bay du Nord offshore project.
The offshore works saw the recovery of 135 concrete mattresses, more than 12 km of rigid pipelines, 15.5 km of flexibles, and around 1500 grout bags.
The agreement, the first well services contract between the companies, includes well integrity remediation services and SCP mitigation.
TGS has announced a new 3D seismic survey in partnership with Schlumberger.
SBM Offshore will construct, install and then lease and operate the ONE GUYANA FPSO for a period of up to 2 years.
The company’s fourth, and largest, project in the Stabroek Block offshore Guyana is expected to produce approximately 250 000 bpd starting in 2025.
Oil Plus will develop and deliver a proactive topsides maintenance resilience and equipment reliability programme for the unnamed operator.
Operating from three vessels, a Fugro team of survey specialists will perform a range of in-depth geotechnical and geophysical assessments, as well as establishing environmental baseline data.
The project applies a modern comprehensive broadband processing workflow to 3363 km2 of 3D data to better understand the hydrocarbon prospectivity of the Tarakan Basin.
PowerNap is a subsea tie-back to the Shell-operated Olympus TLP, located in the US Gulf of Mexico with an estimated peak production of 20 000 boe/d.
The end user, a major operator, will deploy Oceanic Environmental Control Fluid in a field in the North Sea.
The campaign execution will involve the recovery of 18 Subsea XTrees, 18 Flowbases and associated spool sections, one wellhead severance and recovery of up to 18 Temporary Guide Bases at the Enfield Field, Australia.