Skip to main content

Offshore & subsea

 

PGS awarded acquisition project in the Mediterranean

PGGS has been awarded a 3D project in the Mediterranean for a major energy company. The Ramform Hyperion is scheduled to start the survey early March and the project has a total duration of approximately 30 days.

 
 
 
 
 
 
 

Sangomar FPSO arrives in Senegal

Woodside Energy has announced that the Léopold Sédar Senghor floating production storage and offloading (FPSO) facility has safely arrived offshore Senegal.

 
 

Shearwater Geoservices wins 3D seismic survey contract

Shearwater GeoServices Holding AS has announced it has been contracted by the Oil and Natural Gas Corporation Limited (ONGC) for a survey project in the Cauvery Basin, located off the east coast of India.