Production operations resume at Hurricane Energy's Lancaster field
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Production from the 205/21a-6 well is currently stabilising, and a further update will be given in the company's next monthly production release, which is scheduled for mid-August 2021.
Read the latest issue of Oilfield Technology in full for free: Issue 2 2021
Oilfield Technology’s second issue of 2021 starts with a report from KPMG that examines the outlook for the Scottish oil and gas sector. The rest of the issue is dedicated to articles covering the offshore supply chain industry, offshore asset integrity, expandable liner technology, advances in drilling, data security, flow control, EOR and methane emissions.
Exclusive contributions come from Tata Steel, EM&I Group, 3X Engineering, Enventure Global Technology, Varel Energy Solutions, Adrilltech, Tendeka and more.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/28072021/production-operations-resume-at-hurricane-energys-lancaster-field/
You might also like
Union Jack Oil plc sign farm-in agreement with Reach Oil and Gas for the Sark Drilling Project
The agreement is to acquire a 60% working interest (paying 80%) in the Sark well, planned to be drilled early 3Q25, located in Central Oklahoma, US.