BHP contracts DORIS for the engineering of Trion SURF and export package
The Trion field encompasses an area located in the Perdido belt at a water depth of approximately 2570 m.
The Trion field encompasses an area located in the Perdido belt at a water depth of approximately 2570 m.
The drilling operation by the Stena Forth drillship is estimated to take 30 days and shall drill to approximately 3000 m subsea.