Skip to main content

Offshore & subsea - 22 November 2019

Appraisal and flow test completed at Tambak-1 well

The drill stem test flowed dry gas from the intra-Muda sands at a rate of 11.4 million ft3/d on a 181/64-in. (2.8 in.) choke, maintaining a wellhead tubing pressure of 225 psi.