Aker BP contracts Maersk Drilling rig for one-well exploration campaign
In direct continuation of the Maersk Integrator rig’s work scope, the rig will drill an exploration well for Aker BP offshore Norway.
In direct continuation of the Maersk Integrator rig’s work scope, the rig will drill an exploration well for Aker BP offshore Norway.
Recoverable resources are so far estimated at between 3 and 4.2 million m3 of recoverable oil equivalent, corresponding to 19 – 26 million boe.
Fugro is supporting Jumbo in the installation of 35 subsea torpedo piles and 24 mooring lines down to water depths of 1980 m.
ADM Energy, OES Energy Services and 4Mation Drilling Services plan to explore opportunities to develop the Barracuda field in OML 141 and associated work-related activity in Nigeria.
TechnipFMC will supply up to eight manifolds for production and injection, utilising its all-electric Robotic Valve Controller.
Work on the 228 m length Stena DrillMAX saw a 48 000 running hours service on a Wartsila W16V32 engine carried out by a team of engineers in Las Palmas in The Canary Islands.