HMH to deliver pressure control system for GMGS drillship
The system will comprise of a blowout preventer (BOP) stack as well as an 8202 ft (2500 m) riser package.
The system will comprise of a blowout preventer (BOP) stack as well as an 8202 ft (2500 m) riser package.
Oil Plus will develop the maintenance strategy and programme for DeNovo’s renewable energy-powered Zandolie platform, located offshore western Trinidad.