LUKOIL drill second well in Yury Korchagin field
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The single-bore well with horizontal completion was drilled from a jack-up rig. The measured depth of the well is 3736 m. The well's initial flow rate is approximately 600 t of crude oil per day. LUKOIL has already started drilling of the third production well at the Eastern part of the field.
LUKOIL applies a wide range of advanced technologies to ensure the development of the reserves in the most efficient way. In particular, an electro-hydraulic intelligent completion system was used for the first time at the new well. The system allows to control the valves of the horizontal wellbore in the real time mode, providing for an optimised oil influx and higher operational safety.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/14112018/lukoil-drill-second-well-in-yury-korchagin-field/
You might also like
TotalEnergies is awarded four offshore exploration permits
TotalEnergies has signed four Production Sharing Contracts (PSC) for the LB-6, LB-11, LB-17 and LB-29 Exploration blocks offshore Liberia, which were awarded following the 2024 Direct Negotiation Licensing Round organized by the Liberia Petroleum Regulatory Agency.