Skip to main content

Offshore & subsea - 09 June 2020

 
 
 

Equinor to partially electrify Sleipner field centre

Electrification of the Sleipner field centre will entail laying a new power cable from Sleipner to the Gina Krog platform, which will be tied into the area solution for power from shore on the Utsira High.

 
 
 

TGS completes Santos Basin survey

The survey is located south of the high-profile discoveries in the Santos Basin and the recent sought-after blocks offered in Rounds 15 and 16.