L&T Hydrocarbon Engineering awarded offshore platform contract by ONGC
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The EPCIC contract involves Engineering, Procurement, Construction, Installation and Commissioning of a new living quarter platform, ‘NQL Platform’ of 120 men capacity, bridge (with intermediate support) to existing ‘NQO Complex’ and major revamping / replacement of existing process systems / facilities at ‘NQ Complex’ in ONGC’s Mumbai High asset on the West Coast of India.
Subramanian Sarma, Whole-time Director & Sr. EVP (Energy), Larsen & Toubro Limited and CEO & MD, LTHE said: “We have been delivering several large and mega projects for ONGC over the past decade. Our world-class fabrication facilities at Hazira (West Coast) and Kattupalli (East Coast) enable us to maximise the local content, entirely supporting the Government’s AatmaNirbhar Bharat Policy.”
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/08012021/lt-hydrocarbon-engineering-awarded-offshore-platform-contract-by-ongc/
You might also like
Curbing GHG emissions and costs
Michael Weidenfeller, Product Strategy Manager for Drilling and Mobile Power Applications, Caterpillar Oil & Gas, highlights how fuel-flexible dual-fuel engine technology is an important and reliable solution to reduce diesel consumption on oil and gas rigs.