CGG completes 4D seismic results for BP Angola survey
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The enhanced imaging volumes from the Greater Plutonio development in the Lower Congo Basin were delivered four weeks early for the project.
Radwa El Zidan, geophysicist from the BP-Angola asset team, commented: “We were very impressed by the CGG team’s commitment to achieving an early delivery of the data on what was already a challenging schedule. The early delivery of results will accelerate our active reservoir management program for this field.”
Peter Whiting, SVP Geoscience EAME, CGG, said: “This exceptional performance is a result of CGG’s commitment to working closely with clients to support their ambitions to reduce cycle times without compromising quality. We continue to invest in the latest technology, compute resources and talented people to deliver best-in-class products with exceptional turnaround times that accelerate decision-making on time-critical projects.”
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/02102019/cgg-completes-4d-seismic-results-for-bp-angola-survey/
You might also like
Global gas demand 2025
If current trends persist, future energy demand will outpace demand expectations in many scenarios, positioning natural gas as the most scalable and responsive solution to meet growing power needs and stabilise grids.