Launch of second stage of Urengoyskoe field
Published by Joseph Green,
Editor
Oilfield Technology,
SeverEnergia (a joint venture between Novatek and Gazprom Neft) has launched the second stage of the Urengoyskoye field (within the Samburgskiy license area) including the second train of the gas condensate de-ethanisation unit.
Overall capacity of the two stages of field development is approximately 13 billion m3 of natural gas and more than 4.7 million t of de-ethanised gas condensate per annum.
The wells drilled at the Urengoyskoye field target the Achimov deposits, which are characterised by relatively high depth (approximately 3700m) and high share of gas condensate in the hydrocarbon flow.
Adapted from press release by Joe Green
Read the article online at: https://www.oilfieldtechnology.com/exploration/19122014/launch-second-stage-urengoyskoe-field-severenergia/
You might also like
Weatherford awarded Managed Pressure Drilling contract for Woodside Energy’s Trion deepwater development
The multi-year contract includes MPD services for an initial 8 wells with the potential to expand to 24 wells. The award reinforces Weatherford’s market leadership in high-performance MPD and expands its presence in Mexico’s offshore energy sector.