CGG to continue operating 4D PRM imaging centre for Equinor
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Equinor’s asset teams analyse the 4D seismic images delivered by CGG’s imaging experts within days of acquisition in order to optimise production management and recovery from the Johan Sverdrup, Snorre and Grane fields in the Norwegian North Sea.
Peter Whiting, EVP, Geoscience, CGG, said: “This contract renewal recognizes the unparalleled experience CGG has gained over the last decade as the industry’s preferred imaging partner for major offshore PRM projects. This imaging center is an excellent example of the market-leading dedicated seismic imaging solutions and in-house technical excellence we deliver to clients worldwide.”
The extended PRM imaging contract will run from 1 January 2022 until 31 December 2024.
Read the latest issue of Oilfield Technology in full for free: Issue 4 2021
The issue starts with a report from Rystad Energy focusing on the outlook for the upstream industry in the Middle East. The rest of the issue is dedicated to features covering production optimisation, drill bits, pipeline integrity, health and safety, and more.
Exclusive contributions come from Varel Energy Solutions, Rystad Energy, Gyrodata, 3X Engineering, Tracerco, Ulterra Drilling Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/exploration/18012022/cgg-to-continue-operating-4d-prm-imaging-centre-for-equinor/
You might also like
Raising the bar for well barriers
Scott Gordon, Director of RBP product line, The WellBoss Company, describes a century of evolution for well control barriers and the growing role of retrievable bridge plugs in modern well integrity strategies.