Skip to main content

Well testing commences at North-Komsomolskoye Field

Published by , Digital Assistant Editor
Oilfield Technology,


Rosneft and Statoil have announced the commencement of testing of two production wells of highly viscous oil of the PK1 layer of the North-Komsomolskoye field.

The companies plan to implement pilot operation of the horizontal wells constructed using best practices related to inflow control and consolidation of entrained solids.

Average starting flowrate amounts to 75 tpd. Oil production potential has been estimated at 100 tpd for one well. Such results demonstrate strong synergy effect of the experience and expertise of Rosneft and Statoil.

During the well testing the companies are planning to undertake a complex of studies including hydrodynamic and tracer studies. Also, laboratory investigations of the surface oil samples will be implemented.

Obtained data will be applied in updating of geological structure of PK 1 layer’s deposit and further elaboration of the strategy of full-scale development of the North-Komsomolskoye field.

Edited from press release by

Read the article online at: https://www.oilfieldtechnology.com/exploration/08022016/well-testing-commences-at-north-komsomolskoye-field-2402/

You might also like

The President of the Republic of Cyprus meets Eni CEO

President Christodoulides and Eni’s CEO reviewed the discoveries made in 2022 by Eni and its partner TotalEnergies of Cronos and Zeus which led to the drilling of the Cronos 2 appraisal well in late 2023.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news