BW Energy reports results from Dussafu discovery
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
BW Energy has now concluded the drilling and the logging of the exploration well, Hibiscus North (DHBNM-1). The well is located in a separate structure, approximately 6 km north-northeast of the Hibiscus discovery in 115 of water depth. The well was drilled to a total depth of 3336 m. During the drilling operations at Hibiscus North, oil-bearing reservoir was encountered in the Upper Gamba sandstone and in the deeper Dentale formation. Wireline logging operations and fluid samplings showed lower volumes of hydrocarbons than expected. Pending further analysis, the preliminary results indicate that the field could be incorporated into future development planning with a possible tie back to the Hibiscus Ruche development but with reserves below the lower end of the pre-drill resource estimate of potential 10 to 40 million barrels of oil.
The existing Hibiscus 2P gross recoverable reserves of 46.1 million barrels established by the Hibiscus well (DHIBM-1) and its appraisal sidetrack, drilled in 2019, remain unaffected and will form the core of the upcoming Hibiscus/Ruche development project. Planning for this next phase remains on track.
The Borr Norve jack-up is now continuing to finalise drilling operations and the well will then be plugged and abandoned.
Read the latest issue of Oilfield Technology in full for free: Issue 3 2021
Oilfield Technology’s third issue of 2021 starts with a report from Wood Mackenzie focusing on the upstream industry’s fortunes in Asia-Pacific. The rest of the issue is dedicated to features covering offshore engineering, coiled tubing, frac technology, completion technologies, water management, well placement and much more.
Exclusive contributions come from Wild Well Control, Cudd Pressure Control, TMK, NOV, Archer, Tendeka, TETRA Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/exploration/06092021/bw-energy-reports-results-from-dussafu-discovery/
You might also like
BOEM analyses proposed offshore well stimulation work at platform Gilda offshore California
The Bureau of Ocean Energy Management has issued a Notice of Intent to prepare an Environmental Impact Statement for a proposed update to the Santa Clara Unit Development and Production Plan, which includes the use of hydraulic fracturing on 16 existing wells at Platform Gilda, located 8.8 miles offshore Ventura County, California.