Global Marine Systems installs cable for Gjøa floating platform
Global Marine Systems has announced the successful completion of the Gjøa power cable installation. Gjøa is the first ever floating platform to have power supplied by a direct link from shore, and will contribute to a greener source of energy, reducing carbon emissions by an estimated 210 000 tpy.