Block Energy secures workover equipment for 2019/2020 drilling programme
The equipment includes multiple high-impact horizontal sidetracks at the West Rustavi licence in Georgia.
The equipment includes multiple high-impact horizontal sidetracks at the West Rustavi licence in Georgia.
The contract is for the the Shelf Drilling Scepter jack-up rig, and is expected to run from 1Q20 to 2Q22.
The onshore Dunga oilfield in western Kazakhstan is operated by Total (60%), alongside Oman Oil Company (20%) and Partex (20%).
Eco and its partners on the Orinduik Block, Tullow Guyana B.V. (Operator, 60% Working Interest (WI)) and Total E&P Guyana B.V. (25% WI), estimate the well will take up to 40 days to drill.
The license refers to Block WB03, located in the medium deep waters of the Tano Basin offshore Ghana.
The contract is for six high-pressure high-temperature exploration wells on two jack-up rigs in the Arabian Gulf.
100 Chinese investors participated and discussed investment in oil and gas with the African country's Ministry of Mines and Hydrocarbons’ delegation.
Located in close proximity to the major industrial hubs on the US East Coast, Marcellus and Utica shale plays in the Appalachian basin have witnessed steady natural gas production growth over the last five-six years.
The company is aiming to raise up to £8.25 million through the issuance of new ordinary shares.
Recoverable resources are estimated at 22 million bbl of oil.
Quality Intervention was founded in 2008 and provides a portfolio of products and service, including coiled tubing technology , annular integrity technology and in-situ wellhead remediation tooling.
The technology from Drilling Systems mirrors the environment of a working onshore rig, enabling the simulation of various operational scenarios in a controlled atmosphere, including stuck-pipe and well-control incidents.
The energy-saving marine compressed air system is to be delivered for a mid-water semi-submersible drilling rig.
Churchill Drilling Tools' dart activated HyPR HoleSaver was used to sever the drill string and plug and abandon the section.
The agreement secures for the company immediate access to up to 90 000 bbl of storage capacity at Georgian Oil and Gas Corporation's main facility near the town of Sartichala, located some 30 km from West Rustavi.