Skip to main content

Drilling & production

 
 
 
 
 
 
 

Santos announces Caley reservoir flow test results

The initial clean-up flow test of the Caley reservoir, in the Dorado field located in the Bedout Basin, offshore Western Australia, was conducted over a 12-hour period and achieved a maximum measured rate of approximately 11 100 bpd and 21 million ft3 of associated gas per day through a 68/64 in. choke.

 
 
 

Maersk Supply Service vessel to support Pemex operations

The Maersk Installer will join the Maersk Implementer in the Bay of Campeche, performing general support duties, well stimulation as well as inspection, maintenance and repair for Pemex’s platforms.

 
 

Norway government reports on status of major projects

Thirteen of the projects reported on are being developed by Equinor. Eight of the company's projects have reduced costs since submitting their plans for development and operation, one project remains unchanged, while four projects have reported higher costs.

 

Keppel Offshore and Sete Brasil reach settlement

The settlement is in relation to engineering, procurement and construction contracts for the construction of six semi-submersible drilling rigs for subsidiaries of Sete Brasil.