Skip to main content

Drilling & production - 29 March 2018

Total announces start of production at Timimoun gas field in Algeria

Total announces first gas from the Timimoun field in southwestern Algeria. The production complex with a capacity of around 5 million m3 of natural gas per day at plateau (around 30 000 boepd, is jointly operated by Sonatrach (51%), Total (37.75%) and Cepsa (11.25%).