CNOOC starts production at South China Sea oilfield
The Weizhou 11-2 oilfield phase II project, located in the Beibu Gulf, is expected to reach its peak production of approximately 6000 bpd in 2022.
The Weizhou 11-2 oilfield phase II project, located in the Beibu Gulf, is expected to reach its peak production of approximately 6000 bpd in 2022.
The first phase of the Morocco drilling campaign consisted of three appraisal/development wells in SDX's operated Gharb Basin acreage in Morocco.
The contract is for the drilling of three firm wells and two optional wells offshore Israel, with the first firm well expected to spud in 1Q22.
The FPSO is located in UKCS Block 13/28a on the Blake and Ross Fields, 72 miles north east of Aberdeen, since 1999.