Skip to main content

Tamarama-1 Well 5 stage simulation completed

Published by , Digital Assistant Editor
Oilfield Technology,


The Cooper Basin focused oil & gas exploration company, Real Energy Corp. Ltd announced that the company has completed the five-stage fracture stimulation program of Tamarama – 1 well at depth below 2300 m. The 5 stage stimulation program went as planned and was completed without any environmental and safety incidence.

Real Energy well placed to unlock significant value from its Cooper Basin acreage – taking advantage of growing demand for gas in the Eastern States of Australia.

Edited from press release by

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/27052016/completion-of-the-5-stage-stimulation-at-tamarama-1-well-3403/

You might also like

McDermott awarded offshore contract by Brazil's BRAVA Energia

Under the contract scope, McDermott will execute the transportation and installation of flexible pipelines, umbilicals and associated subsea equipment for two new wells at the Papa-Terra field and two new wells for the Atlanta Phase 2 development.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news