Skip to main content

Drilling permit awarded to Statoil

Published by , Editorial Assistant
Oilfield Technology,


The well will be drilled from the Songa Delta drilling facility at position 64°18’59.30’’ north and 07°09’24.30’’ east.

The drilling programme for well 6407/7-9 S relates to drilling of an exploration well in production licence PL 107 C. Statoil Petroleum AS is the operator with an ownership interest of 20%. The other licensees are Engie E&P Norge (40%), DEA Norge AS (30%), Faroe Petroleum Norge AS (7.5%) and VNG Norge AS (2.5%). The area in this licence consists of 20.97 km2 of block 6407/7. The well will be drilled about five km north of the Njord field.

Production licence 107 C was awarded on 23 January 2009 in APA 2008. This is the first exploration well to be drilled within the licence.

The drilling permit is contingent upon the operator securing all other permits and consents required by other authorities prior to commencing drilling activities.


Adapted from a press release by Louise Mulhall

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/26072016/drilling-permit-awarded-to-statoil/

You might also like

The President of the Republic of Cyprus meets Eni CEO

President Christodoulides and Eni’s CEO reviewed the discoveries made in 2022 by Eni and its partner TotalEnergies of Cronos and Zeus which led to the drilling of the Cronos 2 appraisal well in late 2023.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news