Eni FPSO starts production in Mexico
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Upon its arrival in Mexico in January 2022, the Miamte FPSO was connected to its Mooring System and went through pre-commissioning and integrated commissioning activities. Following the first hydrocarbon introduction into the FPSO and two more platforms start-up in Amoca and Tecoalli fields, production will ramp up till the full field development will be completed by 2024.
The FPSO has an oil treatment capacity of 90 000 bpd and gas treatment capacity of 75 million ft3/d.
Early production from the Miztón field started in June 2019, 3.5 years from the award of the Contractual Area 1 and 7 months from the Final Investment Decision (FID).
Read the latest issue of Oilfield Technology in full for free: Issue 4 2021
The issue starts with a report from Rystad Energy focusing on the outlook for the upstream industry in the Middle East. The rest of the issue is dedicated to features covering production optimisation, drill bits, pipeline integrity, health and safety, and more.
Exclusive contributions come from Varel Energy Solutions, Rystad Energy, Gyrodata, 3X Engineering, Tracerco, Ulterra Drilling Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/25022022/eni-fpso-starts-production-in-mexico/
You might also like
OTC GreenLight Becomes the World’s First DNV-Qualified Digital Pressure Testing System
As Offshore Technical Compliance (OTC) continues to expand their footprint in the digital pressure testing field of the Oil and Gas industry, their new and improved GreenLight has achieved a major milestone and sets a new standard for digital pressure testing of well control systems.