Skip to main content

Shell starts production at Gbaran-Ubie Phase 2 in Nigeria

Published by , Senior Editor
Oilfield Technology,


Phase 2 follows the success of the first phase of the Gbaran-Ubie integrated oil and gas development, which was commissioned in June 2010. Peak production of around 175 000 boe/d is expected in 2019.

“Today’s announcement is a positive step for Shell’s global gas portfolio,” said Andy Brown, Shell’s Upstream Director. “It is also good news for Nigeria as gas from Gbaran-Ubie Phase 2 will strengthen supply to the domestic market and maintain supply to the export market.”

Eighteen wells have been drilled and a new pipeline constructed between Kolo Creek and Soku which connects the existing Gbaran-Ubie central processing facility to the Soku non-associated gas plant. First gas flowed from the wells in March 2016, with the facilities coming on stream in July 2017.

The Shell Petroleum Development Company (SPDC) is the operator of a joint venture between the government-owned Nigerian National Petroleum Corporation (NNPC, 55%), SPDC (30%), Total E&P Nigeria Ltd (10%) and ENI subsidiary Nigerian Agip Oil Company Limited (5%).

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/24082017/shell-starts-production-at-gbaran-ubie-phase-2-in-nigeria/

You might also like

Flow remediation in subsea environments

Leonard Hamill, Operations Director, Pipetech, discusses the issues facing downhole wells in deepwater environments and how the development of new technologies can address these issues.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Oil & gas news