Borr Drilling rig contracted for work in Mexico
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The programme is expected to commence in 2Q22 for a duration of approximately 150 days, adding revenues of US$15.7 million.
Read the latest issue of Oilfield Technology in full for free: Issue 2 2021
Oilfield Technology’s second issue of 2021 starts with a report from KPMG that examines the outlook for the Scottish oil and gas sector. The rest of the issue is dedicated to articles covering the offshore supply chain industry, offshore asset integrity, expandable liner technology, advances in drilling, data security, flow control, EOR and methane emissions.
Exclusive contributions come from Tata Steel, EM&I Group, 3X Engineering, Enventure Global Technology, Varel Energy Solutions, Adrilltech, Tendeka and more.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/22072021/borr-drilling-rig-contracted-for-work-in-mexico/
You might also like
EnerMech wins major LLOG Gulf of Mexico pre-commissioning contract
Contract is for pre-commissioning services at the Salamanca Platform in the Gulf of Mexico.