ShaMaran: Atrush development update - spud of CK-7
Published by David Bizley,
Senior Editor
Oilfield Technology,
ShaMaran Petroleum Corp. is pleased to announce that drilling operations have commenced on the Chiya Khere appraisal and development well in the Atrush Block in the Kurdistan Region of Iraq.
CK-7 is located in the central area of the Atrush Block approximately 3 km east of the Atrush 2 producing well and 3.5 km west of the Atrush 3 appraisal well.
The main objectives of the well are to appraise the commercial potential of the Mus formation, to help reduce the uncertainty in the location of the medium to heavy oil transition zone and to serve as a further producing well.
The well will be drilled with the Romfor 25 drilling rig and is expected to take approximately 52 days. Planned total vertical depth for the well is approximately 1575 m.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/20092017/shamaran-atrush-development-update--spud-of-ck-7/
You might also like
EnerMech wins five-year North Sea contract on Kraken FPSO
EnerMech has secured a five-year contract to provide Bumi Armada with crane management and lifting services on the Armada Kraken Floating Production Storage and Offloading (FPSO) vessel in the UK North Sea East of Shetland.