Oil Search due to begin preliminary engineering work at Pikka field in early 2020
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/18122019/oil-search-due-to-begin-preliminary-engineering-work-at-pikka-field-in-early-2020/
You might also like
MDL awarded contract by Saipem to support flex-lay campaigns in West Africa
Maritime Developments (MDL) has been awarded a contract by Saipem to provide specialist equipment and operational support for two recent flex-lay campaigns offshore Ivory Coast, Senegal and Mauritania.