Maersk Drilling secures one-well extension for Maersk Valiant
Published by Emily Thomas,
Deputy Editor
Oilfield Technology,
TotalEnergies E&P Suriname, Suriname Branch has exercised an option to add the drilling of one additional well in Block 58 offshore Suriname to the work scope of the drillship Maersk Valiant. The contract extension has an estimated duration of 100 days, with work expected to commence in August/September 2022 in direct continuation of the rig’s current work scope. The contract value of the extension is approximately US$24.3 m, including integrated services provided and a fee for the use of managed pressure drilling. One one-well option remains on the contract.
Maersk Valiant is a high-specification 7th generation drillship with integrated Managed Pressure Drilling capability which was delivered in 2013. It is currently operating for TotalEnergies offshore Suriname.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/17062022/maersk-drilling-secures-one-well-extension-for-maersk-valiant/
You might also like
DNV proposes revised risk management framework for UK offshore renewables industry, built on oil and gas best practice
DNV has released a comprehensive study comparing major accident risks and risk management practices in the UK between the offshore oil and gas and the offshore renewables industries.