Mira 6 horizontal well on-line via downhole pump in Mira 2 vertical well
The recently drilled Mira 6 horizontal well, which ran inside the Castor coal seam for approximately 920 m and intersected the Mira 2 well at about the mid-point, came on-line and is producing water as planned.