CNOOC contract Intergraph to manage engineering data
CNOOC sought to set up a sophisticated information management system and selected Intergraph SmartPlant Foundation because the company determined that it is the most advanced and technically superior solution available in the market.
SmartPlant Foundation will be used to develop the Engineering Digital Information System (EDIS) project EDIS, which will manage the engineering information of 33 offshore platforms for three of CNOOC’s four oil fields, located in Tianjin, Shenzhen and Zhangjiang.
“We are extremely confident that our EDIS project, built on SmartPlant Foundation, will be successful,” said Mr. Jin Xiaojian, general manager of the Engineering & Construction department at CNOOC.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/12052011/cnooc_contract_intergraph_to_manage_engineering_data/
You might also like
Nigeria’s oil and gas industry expands as crude and condensate production reaches 554.4 million bbls and gas output grows by 7.5 billion ft3/d in 2025
Sarens and its subsidiary in Nigeria, Sarens Buildwell, has positioned itself as the optimal strategic partner for the oil and gas sector due to its strong commitment to the highest international standards of safety and operational excellence.