Consent to use Scarabeo 5 at Njord
Published by Louise Mulhall,
Editorial Assistant
Oilfield Technology,
Statoil is the operator at Njord, an oilfield in the Norwegian Sea, located around 130 km north of Kristiansund.
The Njord field has been developed using a semi-submersible drilling, accommodation and production facility, Njord A, and the Njord B FSU. Water depth at the site is 330 m. Production on the field began in 1997.
The PSA has now granted Statoil consent to use Scarabeo 5 for various well activities associated with production wells on the field.
The activities are scheduled to begin on 10 November 2016.
Scarabeo 5 is a semi-submersible drilling facility of the ME 4500 type, built by Fincantieri in Genoa in 1990. It is registered in the Bahamas and classified by RINA/ABS. Scarabeo 5 was issued with an Acknowledgement of Compliance (AoC) by the PSA in May 2003.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/11112016/consent-to-use-scarabeo-5-at-njord/
You might also like
MDL awarded contract by Saipem to support flex-lay campaigns in West Africa
Maritime Developments (MDL) has been awarded a contract by Saipem to provide specialist equipment and operational support for two recent flex-lay campaigns offshore Ivory Coast, Senegal and Mauritania.